Stages of Casting Good Formwork Using Plywood Phenolic Films

Admin 6:49 AM Tips & Tricks

Concrete casting using phenolic film plywood formwork is a process that involves several stages to ensure good and quality results. The following is Steps for casting good formwork using phenolic film plywood:

Also Read: Stages of installing ceramics properly and correctly with MU.
  • Area and Material Preparation:
    - Make sure the casting area is clean of debris and other objects that could interfere process.
    - Make sure that the concrete material to be used has been tested and meets the standards required.

  • Formwork Preparation:
    - Cut the phenolic film plywood according to the desired formwork design. Make sure the size corresponds to the dimensions and shape of the structure to be cast.
    - Install the phenolic film plywood tightly around the casting area, ensuring the connection The plywood sheets are also tightly spaced to prevent concrete leaks.
    - Make sure the formwork is installed correctly and is stable, using supports or suitable fastener.

  • Reinforcement Installation:
    - Install a series of reinforcements according to the planned structural design. Make sure The reinforcement is located in the correct position in the formwork.

  • Installation Accessories:
    - Install accessories such as spacers and supports as necessary to ensure reinforcement remain in the correct position and maintain the distance between the reinforcement and the formwork surface.

  • Concrete Preparation:
    - Mix the concrete according to the specified proportions and recommendations. Make sure it's concrete has the appropriate consistency to facilitate the casting process.

  • Casting concrete:
    - Pour the concrete slowly and evenly into the formwork. Avoid sudden movements which can damage the position of the formwork or reinforcement.
    - Use a concrete vibrator to remove air trapped in the concrete mix and ensure the concrete soaks well throughout the formwork area.

  • Concrete Compaction:
    - Use compaction tools such as special punches to further remove air and ensure the concrete soaks perfectly throughout the formwork area.

  • Blackout:
    - Cover the concrete surface with plastic or a damp cloth to prevent water evaporation too quickly, which can cause cracks on the concrete surface.

  • Maintenance:
    - Allow the concrete to harden for a period of time as recommended before opening formwork.
    - After the appropriate time, carefully remove the formwork. Make sure it doesn't damage concrete surface during this process.

  • Closing:
    - After the formwork is removed, check the casting results to ensure there are no defects or defects damage to the concrete surface.
    - If necessary, carry out painting or other surface treatment as needed.

  • Make sure to always follow the phenolic film manufacturer's guidelines and technical standards applicable in this casting process. Also, ensure that the workers involved have Sufficient knowledge and experience in casting concrete using formwork phenolic plywood film.

    Twitter Facebook Google+ Pinterest LinkedIn

    Share This Artikel

Previous Post Stage Casting Good Formwork Using Phenolic Film Plywood
Next Post Stages of installing ceramics properly and correctly using MU cement

Follow Us

Gallery

ARTICLE

  • PROJECTS
  • VARIOUS
  • SPORT
  • TIPS & TRICKS
  • VIDEO

About Us

PT. Suprajaya Duaribu Satu is a company engaged in the distribution of building materials and construction which has been established since 1992 to support development throughout Indonesia.

Copyright ©PT. Suprajaya Duaribu Satu All Rights Reserved